摘 要:在城鎮(zhèn)燃?xì)夤艿拦こ淌┕ぶ幸隬HS質(zhì)量控制原理,將燃?xì)夤艿拦こ藤|(zhì)量控制點(diǎn)劃分為見(jiàn)證點(diǎn)W、停工待檢點(diǎn)H、旁站點(diǎn)S共3種類型,通過(guò)對(duì)關(guān)鍵節(jié)點(diǎn)進(jìn)行重點(diǎn)控制,確保工程施工質(zhì)量。
關(guān)鍵詞:城鎮(zhèn)燃?xì)夤艿拦こ蹋?施工WHS質(zhì)量控制; 見(jiàn)證點(diǎn); 停工待檢點(diǎn); 旁站點(diǎn)
Discussion on WHS Quality Control during Urban Gas Pipeline Engineering Construction
Abstract:WHS quality control principle is introduced into urban gas pipeline engineering construetion.The quality control points of gas pipeline engineering are divided into witness point(W),hold point(H)and stand-by point(S).The critical control is performed in the key nodes to ensure the quality of projeet construction.
Keywords:urban gas pipeline engineering;WHS quality control during construction;witness point;hold point;stand-by point
1 WHS質(zhì)量控制原理
WHS質(zhì)量控制是工程質(zhì)量控制的一種有力手段,其原理是根據(jù)工程施工工藝特點(diǎn),將質(zhì)量控制點(diǎn)劃分為見(jiàn)證點(diǎn)W、停工待檢點(diǎn)H、旁站點(diǎn)S共3種類型。
①見(jiàn)證點(diǎn)W
見(jiàn)證點(diǎn)是指在質(zhì)量計(jì)劃中規(guī)定的對(duì)某操作的監(jiān)督點(diǎn)。凡是列為見(jiàn)證點(diǎn)的質(zhì)量控制對(duì)象,在規(guī)定的關(guān)鍵工序施工前,施工單位應(yīng)提前通知監(jiān)理單位在約定的時(shí)間內(nèi)到現(xiàn)場(chǎng)進(jìn)行見(jiàn)證或?qū)ζ涫┕?shí)施監(jiān)督。如果監(jiān)督單位未能在約定的時(shí)間內(nèi)到現(xiàn)場(chǎng)見(jiàn)證和監(jiān)督,施工單位自檢合格并做好記錄后,可以進(jìn)入下一道工序。
②停工待檢點(diǎn)H
停工待檢點(diǎn)通常是針對(duì)特殊過(guò)程或特殊工藝的質(zhì)量控制點(diǎn)。凡列為停工待檢點(diǎn)的控制對(duì)象,要求施工單位必須在規(guī)定的控制點(diǎn)到來(lái)之前通知監(jiān)督方(包括監(jiān)理單位、設(shè)計(jì)單位、業(yè)主單位,具體根據(jù)停工待檢點(diǎn)的控制等級(jí)確定,以下同)派人對(duì)控制點(diǎn)實(shí)施監(jiān)控,如果監(jiān)督方未能在約定的時(shí)間到現(xiàn)場(chǎng)監(jiān)督、檢查,施工單位應(yīng)停止進(jìn)入該控制點(diǎn)相應(yīng)的工序,并按合同規(guī)定等待監(jiān)督方,未經(jīng)認(rèn)可,施工單位不能越過(guò)該點(diǎn)繼續(xù)作業(yè)。
③旁站點(diǎn)S
旁站點(diǎn)是指針對(duì)工程關(guān)鍵部位和關(guān)鍵工序的施工質(zhì)量而設(shè)置的全過(guò)程連續(xù)監(jiān)控點(diǎn),要求施工單位必須在規(guī)定的控制點(diǎn)到來(lái)之前通知監(jiān)理單位派人對(duì)控制點(diǎn)實(shí)施全過(guò)程連續(xù)旁站監(jiān)控。旁站點(diǎn)注重的是施工工序或部位的全過(guò)程監(jiān)督,既要關(guān)注過(guò)程,也要注重結(jié)果。
WHS質(zhì)量控制原理是利用業(yè)主、設(shè)計(jì)、監(jiān)理、施工等不同的管理群體,根據(jù)各自不同的職責(zé)分工,對(duì)見(jiàn)證點(diǎn)W進(jìn)行巡視或平行檢驗(yàn),對(duì)停工待檢點(diǎn)H進(jìn)行停工檢查,對(duì)旁站點(diǎn)S進(jìn)行旁站監(jiān)督,通過(guò)以上過(guò)程控制方式及時(shí)糾正和制止施工誤差和錯(cuò)誤,以此來(lái)保證工程施工安全以及各階段、各工序的質(zhì)量達(dá)到預(yù)期目標(biāo)。
2 城鎮(zhèn)燃?xì)夤艿拦こ淌┕HS質(zhì)量控制
根據(jù)城鎮(zhèn)燃?xì)夤艿拦こ淌┕ぬ攸c(diǎn)和工藝,業(yè)主單位在施工過(guò)程中引入WHS質(zhì)量控制原理,提前編制劃分相應(yīng)燃?xì)夤こ添?xiàng)目的見(jiàn)證點(diǎn)W、停工待檢點(diǎn)H、旁站點(diǎn)S,并明確控制要求。通過(guò)各參建方對(duì)關(guān)鍵節(jié)點(diǎn)的控制來(lái)實(shí)現(xiàn)對(duì)燃?xì)夤艿拦こ痰恼w施工質(zhì)量控制,從而有效地預(yù)防質(zhì)量安全事故隱患的產(chǎn)生。
2.1 WHS質(zhì)量控制點(diǎn)的設(shè)置原則
①以現(xiàn)行國(guó)家或行業(yè)燃?xì)夤艿拦こ淘O(shè)計(jì)、施工及質(zhì)量驗(yàn)收標(biāo)準(zhǔn)規(guī)范中規(guī)定應(yīng)檢查的項(xiàng)目為依據(jù)。
②對(duì)燃?xì)庠O(shè)施性能、精度、壽命、可靠性、安全性等有重要影響的因素應(yīng)設(shè)置為質(zhì)量控制點(diǎn)。
③對(duì)燃?xì)夤艿朗┕すに囉袊?yán)格要求、對(duì)下一道工序的工作有重要影響的關(guān)鍵部位或工序應(yīng)設(shè)置為質(zhì)量控制點(diǎn)。
④質(zhì)量不穩(wěn)定、容易出現(xiàn)質(zhì)量缺陷的環(huán)節(jié)應(yīng)設(shè)置為質(zhì)量控制點(diǎn)。
⑤可能對(duì)生產(chǎn)安全有重要影響的關(guān)鍵項(xiàng)目應(yīng)設(shè)置為質(zhì)量控制點(diǎn)。
2.2 WHS質(zhì)量控制點(diǎn)設(shè)置表的編制和確定
工程開(kāi)工前,由業(yè)主單位組織各參建方根據(jù)項(xiàng)目特點(diǎn)編制針對(duì)該項(xiàng)目的WHS質(zhì)量控制點(diǎn)設(shè)置表(見(jiàn)表1)[1],經(jīng)各參建方會(huì)審,由業(yè)主單位審批后確定。經(jīng)確定的質(zhì)量控制點(diǎn)設(shè)置表作為質(zhì)量控制、質(zhì)量監(jiān)督檢查、工程驗(yàn)收的依據(jù)文件之一,在工程質(zhì)量控制全過(guò)程中實(shí)施。各參建方應(yīng)依據(jù)各控制點(diǎn)內(nèi)的工作內(nèi)容制定各自相應(yīng)的質(zhì)量安全控制措施。
2.3 WHS質(zhì)量控制點(diǎn)的實(shí)施和控制
2.3.1WHS質(zhì)量控制點(diǎn)的發(fā)起和實(shí)施
一般情況下,WHS質(zhì)量控制的發(fā)起單位是施工單位,但主體實(shí)施單位為監(jiān)理單位,業(yè)主、設(shè)計(jì)單位只對(duì)部分停工待檢點(diǎn)、旁站點(diǎn)加以控制,對(duì)見(jiàn)證點(diǎn)只是采取隨機(jī)抽檢。
2.3.2WHS質(zhì)量控制點(diǎn)的控制
①見(jiàn)證點(diǎn)控制
施工、監(jiān)理單位為見(jiàn)證點(diǎn)控制責(zé)任方,業(yè)主為監(jiān)督、檢查方。施工單位應(yīng)對(duì)自己負(fù)責(zé)施工的見(jiàn)證點(diǎn)分批進(jìn)行檢查驗(yàn)收,合格后通知監(jiān)理單位進(jìn)行監(jiān)督檢查。在施工單位自檢的基礎(chǔ)上,按照一定的比例,監(jiān)理單位采用巡視、文件見(jiàn)證、現(xiàn)場(chǎng)檢查的方式進(jìn)行控制,業(yè)主采用抽查方式進(jìn)行監(jiān)督。見(jiàn)證點(diǎn)注重的是某一道工序或具體項(xiàng)目施工過(guò)程中的檢查,通過(guò)此方式可以及時(shí)發(fā)現(xiàn)并糾正質(zhì)量問(wèn)題。監(jiān)理單位和業(yè)主有權(quán)對(duì)施工過(guò)程中任何不滿足施工安全和工藝標(biāo)準(zhǔn)的工作提出臨時(shí)中斷,并下發(fā)整改通知書(shū)。
②停工待檢點(diǎn)控制
停工待檢點(diǎn)分高、中、低三級(jí)控制,設(shè)置為施工、監(jiān)理單位控制的為低等級(jí)控制;設(shè)置為施工、監(jiān)理、設(shè)計(jì)單位控制的為中等級(jí)控制;設(shè)置為施工、監(jiān)理、設(shè)計(jì)、業(yè)主單位控制的為高等級(jí)控制。施工單位必須在該點(diǎn)施工完成且自檢合格后通知相關(guān)監(jiān)督方,只有經(jīng)監(jiān)督方指定人員到現(xiàn)場(chǎng)監(jiān)督檢查并給予放行后,才能進(jìn)行該停工待檢點(diǎn)以后的工作。停工待檢點(diǎn)注重的是對(duì)施工的某道工序或檢驗(yàn)項(xiàng)目的結(jié)果檢查,只有經(jīng)監(jiān)督方檢查合格后才能進(jìn)入下一道工序。
③旁站點(diǎn)控制
施工、監(jiān)理單位為旁站點(diǎn)控制責(zé)任方,業(yè)主單位為監(jiān)督、檢查方,業(yè)主單位采用隨機(jī)抽查方式進(jìn)行監(jiān)督。施工單位提前向監(jiān)理單位書(shū)面申請(qǐng),監(jiān)理單位采取旁站檢查方式進(jìn)行全過(guò)程連續(xù)監(jiān)督檢查,及時(shí)糾正誤差和錯(cuò)誤,并形成旁站檢查記錄,業(yè)主單位可在監(jiān)理單位旁站期間隨機(jī)進(jìn)行抽查。
2.4 構(gòu)建考核激勵(lì)機(jī)制確保過(guò)程控制管理落實(shí)
在WHS質(zhì)量控制過(guò)程中,WHS關(guān)鍵點(diǎn)控制的徹底性取決于各參建方,包括施工、監(jiān)理、設(shè)計(jì)和業(yè)主單位等參與人員的工作責(zé)任心。監(jiān)理單位對(duì)現(xiàn)場(chǎng)的控制最為關(guān)鍵,監(jiān)理人員以自身特有的技術(shù)優(yōu)勢(shì),在施工現(xiàn)場(chǎng)監(jiān)理工作過(guò)程中,通過(guò)不同的控制方法可以有效地對(duì)施工現(xiàn)場(chǎng)的誤差和錯(cuò)誤進(jìn)行糾正和制止,來(lái)保證工程質(zhì)量的可控。
為調(diào)動(dòng)以上相關(guān)人員的工作積極性,筆者所在企業(yè)建立了《燃?xì)夤こ蘔HS質(zhì)量控制管理辦法》,將各單位應(yīng)履行的職責(zé)進(jìn)行了劃分,并落實(shí)到對(duì)應(yīng)的單位和個(gè)人,確保每個(gè)關(guān)鍵節(jié)點(diǎn)施工有記錄,過(guò)程有監(jiān)督,發(fā)現(xiàn)問(wèn)題有整改;另外,配套建立了相應(yīng)的考核激勵(lì)機(jī)制,將責(zé)任范圍內(nèi)管理成效直接與員工的績(jī)效掛鉤;針對(duì)設(shè)計(jì)、監(jiān)理、施工單位,則與其相應(yīng)的設(shè)計(jì)、監(jiān)理、施工費(fèi)用掛鉤,形成了一套科學(xué)、有效的激勵(lì)機(jī)制,確保過(guò)程控制管理能夠落到實(shí)處[2]。
3 結(jié)語(yǔ)
安全穩(wěn)定供氣是管道燃?xì)饨?jīng)營(yíng)企業(yè)的服務(wù)宗旨,燃?xì)夤艿拦こ藤|(zhì)量是管道燃?xì)饨?jīng)營(yíng)企業(yè)長(zhǎng)期有效運(yùn)行的命脈。從源頭確保城鎮(zhèn)燃?xì)夤艿拦こ淌┕べ|(zhì)量安全,消除施工階段的質(zhì)量安全隱患,任何管道燃?xì)饨?jīng)營(yíng)企業(yè)責(zé)無(wú)旁貸。管道燃?xì)饨?jīng)營(yíng)企業(yè)通過(guò)在施工過(guò)程中引入WHS質(zhì)量控制原理,加強(qiáng)對(duì)施工過(guò)程的質(zhì)量安全控制,可以有效地從源頭控制安全隱患的產(chǎn)生,確保工程預(yù)期質(zhì)量目標(biāo)得以實(shí)現(xiàn)。
參考文獻(xiàn):
[I]蔣元杰,張金鋒,葉本育.聚乙烯燃?xì)夤艿拦こ藤|(zhì)量管理與控制措施[J]。煤氣與熱力,2013,33(7):B23-B24.
[2]王天寶.燃?xì)夤こ藤|(zhì)量控制探討[J].煤氣與熱力,2014,34(7):B20-B21.